главная форум чат фотогалерея ресурсы новости календарь игротека поиск почта


Страницы: (5) 1 2 3 4 [5]  ( Перейти к первому непрочитанному сообщению ) ответить | новая тема | опрос

> порт стейт контроль новороссийск, отзывы о реальном негативе общения с ни
Werdikt
посетители



Процедуры Государственного Портового Контроля
=======================================
RESOLUTION A.787(19)
adopted on 23 November 1995
PROCEDURES FOR PORT STATE CONTROL
=======================================
&
================================
Resolution A.1052(27)
Procedures for port State control, 2011
================================

The New Inspection Regime (NIR)
of the Paris Memorandum of Understanding (PMoU)
The NIR will replace the existing PSC regime on 1 January 2011.

1. The new target of full coverage
With the introduction of the NIR the PMoU will change its target of inspecting
25% of individual ships calling at each member State to a shared commitment
for full coverage of inspecting all ships visiting ports and anchorages in the PMoU
region as a whole.
1.1. Ship Risk Profile
The Target Factor will be replaced by the Ship Risk Profile. The Ship Risk Profile
classifies ships into Low Risk Ships (LRS) and High Risk Ships (HRS). If a ship is
neither Low Risk or High Risk it is classified as Standard Risk Ship (SRS).
The Ship Risk Profile is based on the following criteria, using details of
inspections in the PMoU area in the last 3 years:
- type of ship;
- age of ship;
- performance of the flag of the ship (including undertaking Voluntary
IMO Member State Audit Scheme (VIMSAS));
- performance of the recognized organization(s);
- performance of the company responsible for the ISM management;
- number of deficiencies;
- number of detentions.
1.2 Company performance
The company performance criteria for the calculation of the Ship Risk Profile is a
new parameter in the PMoU. The PMoU has established a formula which takes
into consideration the deficiencies and detentions in the last 36 months of the
company’s fleet, based on the IMO company number and compares it to the
average of all vessels inspected in the PMoU to determine the performance level.
The companies will be ranked into very low, low, medium and high. Any Refusal
of Access (Ban) will have a negative impact on the ranking of the company.
1.3 Inspection Categories, Time Window, Selection Scheme and
Inspection Types
Recognising the rights of Port States to inspect foreign flagged ships in their
ports at any time, the Paris MoU is introducing the following regime.
.1 Inspection Categories:
The NIR includes two categories of inspection, a periodic and an additional
inspection.
Periodic inspections are determined by the time window. Additional inspections
are triggered by overriding or unexpected factors depending on the severity of
the occurrence.
.2 Time Window
The time window is set according to the Ship Risk Profile as follows:
- HRS: between 5-6 months after the last inspection in the PMoU region;
- SRS: between 10-12 months after the last inspection in the PMoU region;
- LRS: between 24-36 months after the last inspection in the PMoU region.
The time span for the next periodic inspection re-starts after any inspection.
.3 Selection Scheme:
If the time window has passed a ship becomes Priority I. The ship will be
selected for a periodic inspection.
When the time window opens a ship becomes Priority II. The ship can be
selected for a periodic inspection.
If an overriding factor is logged against a ship it becomes Priority I irrespective
of the time window and the ship will be selected for inspection.
If an unexpected factor is logged against a ship it becomes Priority II irrespective
of the time window and the ship can be selected for inspection.
Before the window opens for any risk profile and there are no overriding or
unexpected factor is logged, the ship has no priority status and member States
are not obliged to perform an inspection on such ship but if deemed appropriate
may still choose to do so.
.4 Inspection types (Initial, more detailed and expanded inspection):
The PMoU will not change the inspection types but will extend the expanded
inspection to all ship types.
In case of a periodic inspection each ship with a HRS profile and each bulk
carrier, chemical tanker, gas carrier, oil tanker or passenger ship older than 12
years will have to undergo an expanded inspection. Each ship with a SRS and
LRS profile which is not one of the above mentioned ship types, will undergo an
initial inspection or if clear grounds are established a more detailed inspection.

Any additional inspection shall be, at least, a more detailed inspection. If the ship
has a HRS profile or is of one of the above mentioned ship types, the member
State may decide to perform an expanded inspection instead.
1.4 Refusal of access (banning)
The PMoU will widen the banning for multiple detentions from certain ship types
to all ship types and extend the flag from the black to the grey listed ones.
The banning criteria for the first and second ban will be amended as follows:
If the ship flies a black listed flag it will be banned after more than 2
detentions in the last 36 months;
If the ship flies a grey listed flag it will be banned after more than 2
detentions in the last 24 months.
Any subsequent detention after the 2nd banning will lead to a ban, regardless of
the flag.
Furthermore a time period until the banning can be lifted will be introduced
which is as follows:
1. 3 months after the first ban;
2. 12 months after the second ban;
3. 24 months after the third ban;
4. permanent ban.
To lift the 3rd ban more stringent conditions are applied which have to be fulfilled
before the 24 months has elapsed.
1.5 Reporting obligations
With the NIR the PMoU has widened the arrival notifications. The former regime
had already a 72 hour pre-arrival (ETA72) message in place. This was only
relevant for a few ship types and only in case these were eligible for an
expanded inspection. The ETA72 is now widened to all ships with a HRS profile
and also to each bulk carrier, chemical tanker, gas carrier, oil tanker and
passenger ship older than 12 years eligible for an expanded inspection. Eligibility
for expanded inspection can be consulted on www.parismou.org after 1 January
2011.
Further, as previous, it is required that all ships provide a pre-arrival notification
24 hours in advance (ETA24).
Both the ETA72 and ETA24 notifications are obligations for the ship and shall be
made to the Port State in accordance with their national arrangements.
A new reporting requirement which is introduced with the NIR is the notification
of the actual time of arrival (ATA) and the actual time of departure (ATD) of all
ships calling at all ports and anchorages in the PMoU region.
22.09.12 - 07:53 #5222796
Anti
посетители



QUOTE (hlu386 @ 21.09.12 - 22:05)
Всё больше убеждаюсь, что все конвенции пишутся офисными крысами, далёкими от работы на флоте - с целью отъёма денег у судовладельцев. Количество проверок давно превышает разумный уровень.

в суд пробовали обращаться? коллегиально ?
22.09.12 - 10:11 #5222959
Pluton
посетители



например в балласте находят недопустимые примеси и запрещают его отдавать при погрузке :D
22.09.12 - 11:24 #5223038
Werdikt
посетители



Причем "Недопустимые примеси" хохлы находили даже в питьевой воде, которую им подсовывали в виде "проб балласта".
Цена вопроса 1бакс за тонну балласта, который будет сливаться и определен как не соответствующий нормативам Украины , или 3000 баксов отката (лаборатории, через агента )
Новошип, по моему, судился.... Проиграл. Такие хитрые "нормы" в законе.
22.09.12 - 12:55 #5223161
Enginer
автофорумцы



QUOTE
в суд пробовали обращаться? коллегиально ?


Деталей всех не знаю. С рассказа человека, который был на борту. Капитан норвег с хохлами не стал разговаривать, а позвонил сразу в офис. Там как-то уже разгуливалось потом в верхах и вроде как сошлись, что компания какий-то сбор экологический будет платить.
Это опять, же с рассказа, что Судно больше не прессовали...


По впечатлению прохождения ПСК на КТК, пришли - осмотрели - написали. Никаких левых претензий не было. Справедливое замечание, которое впрочем устранили уже на переходе до следующего порта (Роттердам). В Роттердаме прошли еще раз ихний ПСК, уже без замечаний.
Пограницники, те да - сразу в кладовку шарить пошли... набрали сигарет....
22.09.12 - 16:41 #5223408
Werdikt
посетители



QUOTE (Anti @ 21.09.12 - 13:05)
Период шесть календарных месяцев не является отклонением для проведения инспекции так часто, как Власть сочтет нужным.[B][/B]

эта норма по сути носит рекомендательный характер и ПСК и ПФК могут быть и каждые 5,4,3,2,1 месяц?

If the ship‘s status is HighRiskShip
or
it is a passenger ship, tanker or bulk carrier older than 12 years - mandatory expanded inspection by PSC
01.10.12 - 13:52 #5234898
1 Пользователей читают эту тему (1 Гостей и 0 Скрытых Пользователей)
0 Пользователей:

Topic OptionsСтраницы: (5) 1 2 3 4 [5]  ответить | новая тема | опрос